Quantities you can take to the BOQ table.

Indicative material quantities calibrated for Lucknow / UP residential construction — based on 50% construction footprint per floor and bye-law openings. Final BOQ is signed by our Civil Engineer Incharge.

Cost-Split Reference

Where the budget goes

  • Foundation7%
  • Civil structure55%
  • Mumty · Parapet · OHT3%
  • MEP — Plumbing + Electrical30%
  • Finishing & interior5%
Civil — 55% + Foundation 7% + Mumty/Parapet/OHT 3%

Structural & Masonry Quantities

Steel (TMT — TATA / SAIL / JSW)
22,500 kg
RCC concrete (slab + beam + column)
110.4 m³
Cement (UltraTech / ACC / Ambuja)
883 bags
Coarse aggregate (20 mm)
3,510 cft
River / M-sand
1,755 cft
Bricks (modular / fly-ash)
36,000 nos
Finishing — 5%

Flooring & Openings

Floor tiles (Kajaria / Somany / Johnson)
2,678 sqft
Doors
20 nos
Windows
15 nos
Ventilators
7 nos
MEP — 30% (Electrical share)

Electrical Distribution

Electrical points
180 nos
Wiring (Polycab / Havells / Finolex FR)
2,160 m
PVC conduit (AKG / Precision)
1,296 m
Distribution boards (Schneider / Legrand)
3 nos
MEP — 30% (Plumbing share)

Plumbing & Sanitary

Toilets
9 nos
CPVC water supply (Astral / Ashirvad)
237 m
UPVC drain / soil (Supreme / Prince)
168 m
Floor + P / S traps
36 nos
CP taps & faucets (Jaquar / Hindware)
39 nos

Disclaimer — quantities are indicative for Lucknow / UP residential construction. A signed BOQ is issued within 72 hours of plot visit.